Town Square

Post a New Topic

Lightning knocks out power to SLAC

Original post made on Apr 13, 2012

A lightning bolt struck a main electrical-transmission line to the SLAC National Accelerator Laboratory Thursday night, shutting down the linear accelerator and causing nearly 1,600 employees to stay home on Friday, a SLAC spokesman has confirmed.

Read the full story here Web Link posted Friday, April 13, 2012, 4:01 PM

Comments (1)

Like this comment
Posted by Herb Borock
a resident of Professorville
on Apr 13, 2012 at 4:20 pm

Palo Alto Utilities Department is considering constructing a distribution line between SLAC and Palo Alto's electricity distribution system that would provide a backup source of power to both Palo Alto and SLAC and that would also serve Stanford. Cost estimates presented to the Utilities Advisory Commission have never shown whether SLAC (U.S. Department of Energy) and Stanford University would share equally in the cost of that distribution line. If that distribution line is built, I believe the three entities should each pay one-third of the cost.


Sorry, but further commenting on this topic has been closed.

Burger chain Shake Shack to open in Palo Alto
By Elena Kadvany | 15 comments | 4,045 views

Eat, Surf, Love
By Laura Stec | 4 comments | 1,283 views

The Cost of Service
By Aldis Petriceks | 1 comment | 913 views

One-on-one time
By Cheryl Bac | 0 comments | 333 views

This time we're not lying. HONEST! No, really!
By Douglas Moran | 0 comments | 149 views